City Gate powered by green energy in February

In Feburary 2022 City Gate Building was powered by green electricity produced at the Gołdap Wind Farm.

The farm is located in the Warmian-Masurian Voivodeship, was commissioned in 2011, and consists of 16 power plants of the Vestas V90 3 MW type.

Certificate of Green Energy Guaranteed Sale confirms the purchase of green energy by the Ogrodowa-Inwestycje, which is the owner of the City Gate Building.